CE587-S24-S01
Lab# 6 BIM for Cost Estimating
Skip To Content
Dashboard
  • Login
  • Dashboard
  • Calendar
  • Inbox
  • History
  • Help
  • Media Storage
Close
  • My Dashboard
  • CE587-S24-S01
  • Assignments
  • Lab# 6 BIM for Cost Estimating
S24
  • Home
  • Syllabus
  • Modules
  • Assignments
  • Office 365
  • Library Research Guides
  • Microsoft Teams meetings
  • Microsoft Teams classes
  • Zoom
  • Folio

Lab# 6 BIM for Cost Estimating

  • Due Mar 10, 2024 by 11:59pm
  • Points 10
  • Submitting a file upload

This exercise has several component parts dealing with the integration of Autodesk REVIT & cost estimating applications. 

Part 1 Produce a quantity takeoff from your model created in lab #4

  1. Download and open the Revit File Structural Framing.rvt Download Structural Framing.rvt
  2. With the help of this video tutorials: Select Fields for a Schedule Links to an external site. and Calculate Total in a Schedule, Links to an external site.create the schedules (include the parameters you will use in a cost estimate, like length, area, volume where apply) for the following categories of elements:
    • Floors
    • Structural Columns
    • Structural Foundations (for strip footings and isolated footings)
    • Structural Framing (for beams)
    • Walls (for foundation walls)
  3. Using the Revit Help on Export a Schedule Links to an external site. export your schedules from Revit.
  4. Import your schedules to excel in a single file and create a summary sheet.
  5. Create a report of the advantages and limitations of this approach to produce a quantity takeoff for cost estimating.

Part 2 

  1. Download and unzip the file Revit to cost.zip Download Revit to cost.zip and perform the following tasks with the extracted files (please be sure to unzip it and work on the extracted files).
  2. Open the attached “Research Lab-w-Smallfitness16.rvt” and review the schedules created in this file.
  3. Open the attached Total Project Cost.XLS spreadsheet file. Examine its contents and structure.
  4. Compare the schedule information contained in the REVIT file with that in the Spreadsheet file
  5. Read the files “REVIT in cost estimating.doc” and “REVITScheduleViews.PDF” included in the ZIP file. The first document explains a “home-made” process to automate the integration of information between REVIT and the Cost Estimating spreadsheet. The second document explains how to create schedules in REVIT. You are encouraged to consult the Help files available in Autodesk REVIT software for a more up-to-date instructional material in this regard.
  6. Visit the website of Bexel Manager Links to an external site. software and review the published information on cost estimating capabilities of this software.
  7. Visit the Vico Office- https://vicooffice.dk/en/solutions/5d-financial-management/ Links to an external site. software website and review the published information on cost estimating capabilities of this tool be sure to watch the video.
  8. Compare the process of generating a cost estimate from a REVIT file using the spreadsheet file with the ones produced by using Bexel Manager and Vico Estimator software as described in the vendor’s published literature.
  9. Author a report summarizing your findings and observations from conducting all the steps above.

For part 1 upload your Revit file with the schedules, the excel file with the imported schedules and your report; for part 2 submit your report.

1710129599 03/10/2024 11:59pm
Please include a description
Additional Comments:
Rating max score to > pts
Please include a rating title

Rubric

 
 
 
 
 
 
 
     
Can't change a rubric once you've started using it.  
Find a Rubric
Find Rubric
Please include a title
Title
You've already rated students with this rubric. Any major changes could affect their assessment results.
Title
Criteria Ratings Pts
Edit criterion description Delete criterion row
This criterion is linked to a Learning Outcome Description of criterion
threshold: 5 pts
Edit rating Delete rating
5 to >0 pts
Full Marks
blank
Edit rating Delete rating
0 to >0 pts
No Marks
blank_2
This area will be used by the assessor to leave comments related to this criterion.
pts
  / 5 pts
--
Additional Comments
Edit criterion description Delete criterion row
This criterion is linked to a Learning Outcome Description of criterion
threshold: 5 pts
Edit rating Delete rating
5 to >0 pts
Full Marks
blank
Edit rating Delete rating
0 to >0 pts
No Marks
blank_2
This area will be used by the assessor to leave comments related to this criterion.
pts
  / 5 pts
--
Additional Comments
Total Points: 5 out of 5
Previous
Next

Media Storage


  • Canvas Studio
    Canvas-integrated videos for faculty/students that can be easily integrated with assignments and gradebook.
    User guide
  • Echo360
    Request Lecture Capture: Record and store short and long-form lecture videos in class groupings or your own personal library.
    The Echo360 online guide
  • OneDrive
    WPI cloud-based file storage for documents.

  • Each of the above storage options have a variety of integrations with course assignments, pages, and modules. Email atc-ttl@wpi.edu for more information about each storage option.
Previous Module:
Week 7 - BIM for Construction Managers (February Break)
Next Module:
Week 9 - Faciliators of BIM & Implementation